Product Description
Long Lead Kelvin Probes (Klips)
for Microhm and Bondmeter R1L-B, R1L-BR & R1L-D1
250 ft
Kelvin Probes (Klips), 250 ft, for Models RIL-B, R1L-BR and R1L-D1
$1,495.00
Kelvin Probes (Klips), 250 ft, for Models RIL-B, R1L-BR and R1L-D1
Weight | 15 lbs |
---|---|
Dimensions | 14 × 14 × 14 in |
Weight | 15 lbs |
---|---|
Dimensions | 14 × 14 × 14 in |